GSoC Project | Basic Support for Trace Compass
Ravindra Kumar Meena
rmeena840 at gmail.com
Sun Aug 4 07:54:32 UTC 2019
We don't really need so many sched_switch events in the metadata. I have
removed the extra events.
>
https://github.com/rmeena840/rtems-tools/commit/61003e8013146acf400a79fb9dea982242f5c6af
And for the same, I have made changes in the client program.
https://github.com/rmeena840/rtems-tools/commit/426c2d293f17e3d3150d50a7943a2d22ad382c47
I checked the output with/without it. The babeltrace and Trace Compass
displays the same output.
--
*Ravindra Kumar Meena*,
B. Tech. Computer Science and Engineering,
Indian Institute of Technology (Indian School of Mines)
<https://www.iitism.ac.in/>, Dhanbad
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.rtems.org/pipermail/devel/attachments/20190804/2f7c271f/attachment-0002.html>
More information about the devel
mailing list